Change of work order as a delay factor: A case study of building construction in Kelantan, Malaysia

Ammar Azmi, (2015) Change of work order as a delay factor: A case study of building construction in Kelantan, Malaysia. [MBA Final Project Report]

Full text not available from this repository.

Abstract

This study recommends measures to address the change of work order issues that can be executed on two different phases of the project, before and during construction phase. Pre-planning can be applied before construction starts and can reduce the risk of delay if done right.